Volk Wheels IN STOCK STYLES for the G37
#36
Thread Starter
Former Sponsor
iTrader: (2)
Joined: Feb 2006
Posts: 1,032
Likes: 0
From: Marietta, GA
It depends on the project. Basic installs are in and out within hours, but about 3/4 of our projects are longer term engine builds, forced induction, and major overhauls. Those projects generally take about 8 weeks to complete.
#38
Can anyone say "chop shop"?
I just got finished watching "Crash" for my Personal Communications class. I saw the chop shop seen in the movie and thought of this thread for some reason. lol
I have yet to see a shop with that much space or that many lifts in Colorado yet. The most lifts I have seen are 3.
I just got finished watching "Crash" for my Personal Communications class. I saw the chop shop seen in the movie and thought of this thread for some reason. lol
I have yet to see a shop with that much space or that many lifts in Colorado yet. The most lifts I have seen are 3.
#39
Thread
Thread Starter
Forum
Replies
Last Post
superjoey
D.I.Y. Installations/Modifications
31
03-23-2023 12:56 AM